Figure 1)
Subcontractor and Engineer Wall Penetration..
Figure 2)
Drywall bulkhead
Figure 3)
The new garden area is taking shape.
Figure 4)
All of the exposed electrical panel covers get painted.
Figure 5)
Interior finishes such as paint, wallcovering, wood trim and ceiling tiles are being
installed thru-out the space.
Figure 6)
The exterior work on the fiber cement siding.
Figure 7)
New ADA Damp
Figure 8)
The Community Living Center near 90% completion.
Figure 9)
Finish hallway area of the center.
Figure 1
Fire Rating Label for
Wall Penetration
Figure 2
Added drywall bulkhead
Figure 3
The Garden
Figure 4
All electrical Panel covers need to
be painted.
Figure 5
Hospice care Unit
Figure 6
Living Room area of Hospire Care
Figure 7
New ADA ramp to North Entry
Figure 8
The community living center